Replacement of Process Gas line Hydrogen plant
The Badger Company has successfully completed the engineering of a project for the replacement of a high temperature process gas pipe system at a Hydrogen production facility.
Hydrogen is one of the green solutions for energy transition.
Picture from CADWorx Professional 3D model
The challenge of this project was to keep the configuration of the pipe and the loads on existing structures and equipment the same. Due to technological reasons, process conditions are changed and design temperature is increased from 810 °C to 871 °C which has an impact on the stress of the pipeline.
Due to our design, we eliminated the need for a technical expertise of the existing reactor and possible extra constructive modifications.
We used STAAD.Pro as structural calculation software and CAESAR II for pipe stress calculations. Pipeline, pipe supports and structural beams are designed in 3D design software CADWorx Plant.
2020-11-23 - The Badger Company
More news
21-01-2021
authorized for design of fire limitation and extinguishing systems
17-09-2020
Delamine Turn Around finished
10-09-2020
Romania-Turkmenistan Business opportunities
08-09-2020
Engineering in Ploiesti
25-08-2020
Flange Tree Abu Dhabi
07-08-2020
Certification extended, audits with good result
04-08-2020
Johan Castberg TMS Load out
01-07-2020
Mercury removal plant in magazine Technisch Weekblad
29-06-2020
ASML project with A1 Werkplan
07-06-2020
Rubis tanks in operation
28-04-2020
Sailaway Johan Castberg Turret Gantry
14-04-2020
Mercury plant in Australia
19-02-2020
Rubis phase 2 engineering completed
19-10-2019
Largest Plant Chemelot in Turn Around
12-07-2019
INSEMEX - GANEx certification